Birchfield Natural Resources
Bunkerstore and Extension

All relationships start somewhere, and this one started with Birchfield looking for an alternative price option on their first stage, a 30 metre long bunkerstore. Through efficiencies in construction and control of our supply chain and costs Thompson were able to well and truly deliver on this, with completion in May 2019. A second, 40 metre long stage was added to our scope and this has recently been completed in November 2019.

With the site being a buffer to reduce the risk of road closures accessing the West Coast, and as a distribution point for solid state fuel, firewood, and a range of landscaping supplies our scope didn’t stop at buildings. Weighbridge foundations, concrete pads and storage bunkers using Thompson Y Panels complement the facility and provide the ability to store a range of products, while standing up to the punishment of heavy machinery.

Ashburton
30 Nov 2019
Bunkerstore
1600
Industrial
  • icon-consult.png

    Consult
  • icon-design.png

    Design
  • icon-pre-cast.png

    Precast
  • icon-fabricate.png

    Fabricate
  • icon-construct.png

    Construct