R & M Storage
Extension

With a relationship that revved into life many decades ago and with over 20 projects completed over this time period; Thompson were elated to be working in partnership once more with the Aitken family. At the end of October 2019 R & M Storage’s four-month project parked up with the completion of stage one for their dry store extension in Temuka.
The newly constructed dry storage facility acts as a support service, housing milk products and other food ingredients. The structure features an internal ramp to allow for slope within the site and increased floor specifications to meet the specification of the client’s shuttle racking system.
The strength of the Thompson client-facing team was evident through an extended process of achieving compliance, resource consents along with site and storm water design.
The construction itself went to plan starting with pouring the complex floor slab. Zincalume cladding and Thompson blue steel portals finish off the extension and are unmistakable throughout the completed structure.

Temuka
08 Oct 2019
Industrial
2310
Industrial
  • icon-consult.png

    Consult
  • icon-design.png

    Design
  • icon-fabricate.png

    Fabricate
  • icon-construct.png

    Construct