Hilton Haulage LTD Partnership
Desi Place Shed 7 Store Shed
The new 4710m² warehouse and adjoining office has similar features to the warehouse already built back in 2017 by Thompson on the same site. 
Features such as a ‘Post Tensioned’ concrete slab and sealed loading docks will be used to meet the demands of modern import / export storage needs.
The post tensioned floor will eliminate the need for the matrix of control cuts usually employed in concrete floors to control the cracking caused by shrinking concrete during the curing process.  The elimination of cuts means less places for potential dust and contaminates to reside making cleaning more efficient and robust.
The southern wall features full height precast columns to achieve fire rating and a cost effective build
Construction was completed in February 2020
 
Christchurch
06 Feb 2020
Industrial
4710
Industrial
  • icon-consult.png

    Consult
  • icon-design.png

    Design
  • icon-pre-cast.png

    Precast
  • icon-fabricate.png

    Fabricate
  • icon-construct.png

    Construct